Signalpath Network Rollout
Computers and network devices commissioned for branch offices with labelled ports, tested connections and an accountable asset list.
- Supplier
- Atlantic Network Equipment PLC, foreign-owned, Osun
- Category
- IT support and integration services: Computer installation, set-up and asset tagging
- Ceiling price
- ₦15,000 per device
- Minimum order
- 10 devices
- Data held in
- Osogbo, Nigeria
- Support hours
- Extended hours, 7am to 9pm, Monday to Saturday
- Response times
- Branch commissioning blocked: 1 hour; Configuration correction: 4 hours
- Certification
- None listed
- Listing
- SVC-156, version 1, listed 17 September 2026
Overview
Signalpath Network Rollout serves ministries opening or refreshing small branch offices. Engineers configure supplied computers, switches and printers against the approved addressing and equipment schedule, label each active port and prove access to the ministry's authorised services. For a 25-seat branch, normal work takes two days where power and cabling are ready. We record any unsafe socket, dead cable or missing accessory rather than improvising a change without approval.
What you get
- Branch equipment census
- Configured computers and printers
- Numbered network-port labels
- Connection test results
- Unready-point defect list
How it works
- Five working days before arrivalThe branch sends its floor plan, equipment list and network settings.
- Commissioning visitEngineers install by room and test every authorised connection with ICT staff.
- Handover morningThe branch head signs operational points, defects and retained spare equipment.
Pricing
Quotes cannot go above ₦15,000 per device.
- Device setup
- Port labelling
- Connectivity testing
- Branch register
Replacement cables, electrical repairs, travel to difficult-access sites and active equipment are excluded.
Service levels
- Branch commissioning blocked: 1 hour
- Configuration correction: 4 hours
Availability target: All ready points tested before branch acceptance
Leaving the service
Atlantic Network Equipment provides the branch asset schedule and port test results as CSV, plus marked floor plans in PDF, within three working days. The ministry network officer signs the failed-point register before the project engineer ends site access.
Buy this service
Federal public institutions buy from a registered project. The route for the order's value decides whether the supplier is asked directly, for a quote beside at least two other unrelated suppliers, or in a restricted tender.
