Skip to main content
Coat of arms of the Federal Government of Nigeria

Signalpath Network Rollout

Computers and network devices commissioned for branch offices with labelled ports, tested connections and an accountable asset list.

Supplier
Atlantic Network Equipment PLC, foreign-owned, Osun
Category
IT support and integration services: Computer installation, set-up and asset tagging
Ceiling price
₦15,000 per device
Minimum order
10 devices
Data held in
Osogbo, Nigeria
Support hours
Extended hours, 7am to 9pm, Monday to Saturday
Response times
Branch commissioning blocked: 1 hour; Configuration correction: 4 hours
Certification
None listed
Listing
SVC-156, version 1, listed 17 September 2026

Overview

Signalpath Network Rollout serves ministries opening or refreshing small branch offices. Engineers configure supplied computers, switches and printers against the approved addressing and equipment schedule, label each active port and prove access to the ministry's authorised services. For a 25-seat branch, normal work takes two days where power and cabling are ready. We record any unsafe socket, dead cable or missing accessory rather than improvising a change without approval.

What you get

  • Branch equipment census
  • Configured computers and printers
  • Numbered network-port labels
  • Connection test results
  • Unready-point defect list

How it works

  1. Five working days before arrivalThe branch sends its floor plan, equipment list and network settings.
  2. Commissioning visitEngineers install by room and test every authorised connection with ICT staff.
  3. Handover morningThe branch head signs operational points, defects and retained spare equipment.

Pricing

Quotes cannot go above ₦15,000 per device.

  • Device setup
  • Port labelling
  • Connectivity testing
  • Branch register

Replacement cables, electrical repairs, travel to difficult-access sites and active equipment are excluded.

Service levels

  • Branch commissioning blocked: 1 hour
  • Configuration correction: 4 hours

Availability target: All ready points tested before branch acceptance

Leaving the service

Atlantic Network Equipment provides the branch asset schedule and port test results as CSV, plus marked floor plans in PDF, within three working days. The ministry network officer signs the failed-point register before the project engineer ends site access.

Buy this service

Federal public institutions buy from a registered project. The route for the order's value decides whether the supplier is asked directly, for a quote beside at least two other unrelated suppliers, or in a restricted tender.

Start a purchase

Did you find what you were looking for?

Date modified: