Tensile Data Hall Transfer
Physical and virtual data-centre relocation with rack plans, serial controls, cable schedules and service restoration tests.
- Supplier
- Remo Colocation PLC, foreign-owned, Ogun
- Category
- IT support and integration services: Data centre and cloud migration
- Ceiling price
- ₦650,000 per delivery day
- One-off fees
- ₦1,500,000 for onboarding
- Minimum order
- 10 delivery days
- Data held in
- Sagamu and Lagos, Nigeria
- Support hours
- 24 hours a day, 7 days a week
- Response times
- Critical equipment missing or damaged: 15 minutes; Restored service failed: 30 minutes
- Certification
- Listing
- SVC-127, version 1, listed 18 May 2026
Overview
Tensile Data Hall Transfer covers equipment and workloads moving between data-centre rooms. Remo Colocation records each device, serial number, rack unit, power feed, cable and owner, then develops shutdown and installation waves. Virtual workloads receive backup and restoration tests; physical equipment receives chain-of-custody controls. Specialist packing and transport are planned explicitly. The service does not include the destination rack or ongoing colocation charge.
What you get
- Asset and serial inventory
- Rack, power and cable schedule
- Shutdown and move runbook
- Custody-controlled physical transfer
- Service restoration testing
How it works
- SurveyEngineers trace equipment, links, dependencies and destination capacity.
- RehearsalTeams test shutdown order, labels, contacts and rollback options.
- Move windowEach wave is released only after destination checks pass.
Pricing
Quotes cannot go above ₦650,000 per delivery day, plus ₦1,500,000 once for onboarding.
- Move planning
- Engineering team
- Asset controls
- Restoration support
Transport vehicles, new racks, replacement cables and colocation are separate.
Service levels
- Critical equipment missing or damaged: 15 minutes
- Restored service failed: 30 minutes
Availability target: Project service; each wave has acceptance criteria
Leaving the service
Remo Colocation supplies asset, cable and custody schedules as CSV, move runbooks and test packs as PDF, and rack layouts in editable format within seven working days. The infrastructure director signs restored services before the commercial director records deletion.
Buy this service
Federal public institutions buy from a registered project. The route for the order's value decides whether the supplier is asked directly, for a quote beside at least two other unrelated suppliers, or in a restricted tender.
