Okpokri Technical Drawings Capture
Scanning for mixed project files containing A4 correspondence, bound reports, maps and engineering drawings.
- Supplier
- Warri Cloud Engineering Ltd, Nigerian-owned, Delta
- Category
- IT support and integration services: Records digitisation: scanning, indexing and quality checks
- Ceiling price
- ₦95,000 per 1,000 pages
- Minimum order
- 20 groups of 1,000 pages
- Data held in
- Warri, Nigeria
- Support hours
- Business hours, 8am to 5pm, Monday to Friday
- Response times
- Archive custody discrepancy: 30 minutes; Drawing recapture: 2 business days
- Certification
- Listing
- SVC-124, version 1, listed 31 August 2026
Overview
Okpokri Technical Drawings Capture is for project archives that cannot be priced as identical office pages. Standard A4 pages use sheet-fed scanners, bound reports use overhead capture and large drawings use suitable wide-format equipment. The index links project, contract, drawing number, revision and date. Oversized pages are counted within agreed conversion rules. The supplier records items too fragile or folded for safe processing.
What you get
- Mixed-format preparation plan
- PDF/A reports and correspondence
- Large drawing image files
- Project and revision index
- Fragile-item exception schedule
How it works
- Archive surveyThe team counts formats, sizes, bindings, revisions and damaged material.
- Method pilotRepresentative files are captured and approved at usable scale.
- Production tranchesProjects are returned complete before the next archive group moves.
Pricing
Quotes cannot go above ₦95,000 per 1,000 pages.
- Mixed A4 and bound pages
- Drawing capture allocation
- Project indexing
- Quality review
Conservation, colour-critical imaging and unusually large drawings require quotation.
Service levels
- Archive custody discrepancy: 30 minutes
- Drawing recapture: 2 business days
Availability target: Not applicable; delivery is tranche based
Leaving the service
Warri Cloud Engineering delivers reports as PDF/A, drawings as TIFF and the project index as CSV within seven working days of tranche approval. The project archivist signs format totals and the infrastructure lead certifies deletion.
Buy this service
Federal public institutions buy from a registered project. The route for the order's value decides whether the supplier is asked directly, for a quote beside at least two other unrelated suppliers, or in a restricted tender.
