Aminci Research Rack

A Zaria-operated rack for research and education systems, with planned access and detailed environmental records.

Supplier
Zazzau Data Centre Services Ltd, Nigerian-owned, Kaduna
Category
Cloud infrastructure: Colocation in a Tier III data centre
Ceiling price
₦680,000 per rack per month
Data held in
Kaduna, Nigeria
Support hours
Extended hours, 7am to 9pm, Monday to Saturday
Response times
Rack power lost: 20 minutes; Escort booking: 1 business day
Listing
SVC-032, version 1, listed 23 January 2026

Overview

Aminci Research Rack serves institutions that keep physical compute or storage equipment but no longer want it in an office building. Zazzau Data Centre Services allocates the standard cabinet and power, documents each device and monitors the facility continuously. Planned visits are coordinated around teaching, examination and research schedules. The monthly statement includes access, alarms, power use and open actions. Hardware maintenance, system administration and data backup remain separately assigned unless the buyer adds them.

What you get

  • Numbered 42U rack
  • Two independent power feeds
  • Continuous room-condition monitoring
  • Monthly access and alarm statement

How it works

  1. Ten days before moveWe receive the inventory and prepare rack and power positions.
  2. Installation dayBoth teams check serial numbers before and after mounting.
  3. Within 24 hoursThe institution confirms service operation and signs the cabinet schedule.

Pricing

Quotes cannot go above ₦680,000 per rack per month.

  • Standard cabinet
  • Power allocation
  • One planned visit weekly

Network capacity, insurance of client equipment and replacement parts are not included.

Service levels

  • Rack power lost: 20 minutes
  • Escort booking: 1 business day

Availability target: 99.9% cabinet power availability

Leaving the service

Zazzau provides inventory, access and alarm records in CSV plus a PDF closure note within six working days. The institution's stores officer witnesses removal. Our infrastructure director signs off the vacant cabinet and cancelled visitor list.

Buy this service

Federal public institutions buy from a registered project. The route for the order's value decides whether the supplier is asked directly, for a quote beside at least two other unrelated suppliers, or in a restricted tender.

Start a purchase